A GAPO has started work at a new waste to energy plant inHull.  The plant is designed to createpower for a third of the homes in Hull from over 250,000 tons of waste.  The GAPO is needed to speed up the turnaroundtimes on the skips and to reduce the time that the road is blocked whilst a hook lift loads up.  Solving problems allround.